Projects / Sturminster Newton High School – Re-Boilering

Complete Refurbishment of Boiler Room and all Plant within & modifications to remote plant rooms to site.

Watertite Heating Ltd are currently on the Dorset County Council R&M Framework, undertaking a multitude of repairs, maintenance and replacements to the county’s asset portfolio. The schools existing main plantroom had reached the end of its reliable lifespan and was recently ear marked for complete replacement.

Complete strip out of existing aged gas boiler boilers, gas fired hot water heaters, pump sets, pressurisation units, water softeners, all pipework, control system and builders’ bases, etc. Complete replacement of all the above with modern energy efficient equipment and Trend BMS control system, in a relatively short school summer holiday period, so that all systems were operational for the September 2016 return of the school.

During the project, we also removed and refurbished a large number of cast iron sectional radiators within the school classrooms.

Date Completed: Sept 2016

Design Consultant: - Slade Associates
Project Duration: - 9 weeks
Engineers on Site: - 5
Project Value: - £275k

Sturminster Newton High School – Re-Boilering

Client: Dorset County Council

Principal Contractor: Watertite Heating Ltd

Objectives: Energy Efficient solution offering a robust long term replacement.

Solution: The complete replacement of Energy Centre

Supported By Manufacturers: Broag Remeha, Lochinvar, Smedegaard, Trend Controls

Benefits: Reduced Maintenance Costs, Reliability, Reduced Running Costs