Projects / One Cathedral Square, Bristol

Category A Fit-Out by Watertite Heating Ltd on this 55,000sqft Prestigious Office Block in the Centre of Bristol.

Against a very tight timescale, Watertite have supplied and installed new mechanical services for a Category A fit out at One Cathedral Square in Bristol. The property consists of 55,000 square feet of office space, spread across 4 floor plates, a central atrium, and 4 basement levels of below ground car parking. The location of the building is set immediately between Bristol Cathedral and The Royal Marriott Hotel, on Bristol’s College Green. The services consisted of 160 DX fan coil units, associated roof mounted DX condenser plant, AHU Ventilation Systems, Smoke Extract Systems, Local Ventilation Systems, a full BMS Control System, a boosted cold water system, local stored hot water cylinders, above ground drainage and sanitary ware in core WC and changing areas.

Date Completed: May 2017

Design Consultant: - Hoare Lea
Project Duration: - 6 Months
Engineers on Site:- 25-30
Project Value: - Circa £1.4m

One Cathedral Square, Bristol

Customer: Mac Interiors - Dublin

Objectives: Full “Cat A” Fit-Out of Mechanical Services

Solution: The Supply and installation of Energy Efficient Systems designed to suit strict noise criteria of the planners of condenser farm due to adjoining Royal Marriott Hotel

Supported By Manufacturers: Daikin, Grundfos, ‎Fläkt Woods Group, Duravit, Hans Grohe

Benefits: Zoned Controls for subletting floors/areas to different tenants, Low Maintenance Costs per Sq. ft, Significant Reduction in the Buildings Carbon Footprint